Serial Number Grama Niladhari Division Development Proposal (According to Priority) Development Approach  Estimated Amount (Rs. million)  Expected Source of Funding mplementing Agency
1 834 Bellana Proceeding with further development from the point where development has already been completed, near the residence of Mrs. Chandra Pathirage on Koshenna Road, West Panadukanda Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
2 834 A Bellana East Rehabilitating the Haldola drinking water project by diverting the Kapurukanda water source to another source (Kettayamgala) Social environment.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment National Water Supply and Drainage Board – Rural Water Projects Division
3 834 B Kapugama Rehabilitation of the Pamantotuwa canal and construction of its side embankments. Food security       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Provincial Roads Department (PRD)
4 834 Cviharagama Concreting the road from near the residence of Mr. Lionel Bateegoda on Viharagama Road, extending. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
5 834 D Yakupitiya Construction of the side embankment at Dambarawela on Kankanamgoda Gode Road. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
6 835 Lathpadura Development of Walakumbura Road by laying concrete from near the residence of Mr. Mihindu Wickramarachchi to the residence of Mr. D.K.D. Dharmasena. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
7 835  A Ilukpotha Concreting Hingurakanda Road from near the residence of Mr. M.D. Samarathunga towards the temple. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
8 835 B  Lathpadura East Restoring the abandoned Ambagahawatta water supply project to a stable condition (as the currently used water spring yields less water during dry periods, connecting it to another nearby spring, and linking the pipeline from the small water tank previously used for storage to the larger tank located nearby). Social environment.          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment National Water Supply and Drainage Board – Rural Water Projects Division
Expanding the Cromwell water supply project to provide water to the estate line rooms (as the previously used water pump is currently unusable, installing a new water pump and a pipeline system to supply water to the line rooms). Social environment.          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment National Water Supply and Drainage Board – Rural Water Projects Division
Rehabilitation of the Janasavi Mawatha water supply project (removing the existing 2-inch pipeline and installing a 4-inch pipeline) Social environment.          400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
9 835 C Maragahadeniya Development of Janasavi Mawatha Road by concreting it (from in front of the old residence of Mr. N. Gunapala downwards) Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
10 836 Pelada Concreting Galaganggoda Road near the Medical Center, extending the road from the completed section further ahead. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
11 836  A Morapitiya Development of the Mukalana Road in the Gorokgas Kele area of Kuda Ambegoda by laying metal stones, and extending the road by concreting from the completed section onwards. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
12 836 B Kelinkanda Development of Dimigaha Ela Road by laying concrete from the completed section onwards. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
13 836 C Kapugedara Concreting the road on Uduwankanda Road from near the residence of Mr. U.A. Preethi Prasanna, extending further ahead. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
14 836 D Athwelthota Completion of the remaining work at the community hall. Social environment.          900,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Purchase of two water tanks (10,000 liters each) for the Sumaga Community Water Organization. Social environment.          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
15 836 Epelenda West. Construction of a community hall and provision of office facilities for the deployment of government officials. Social environment.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
16 836 F Galahiti Development of the road towards Hindakaramulla from near the residence of Mr. B.V. Karunadasa in Galahitiya by laying metal stones. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
17 836 G  Morapitiya South Development of the road extending from near Sudu Kanda Dola by laying concrete. Supply networks and access.          800,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Development of the Rilagala Mukalana Road by laying concrete from near the residence of Mrs. Nilanthi Dhammika, extending further ahead. Supply networks and access.          600,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
18 836 H  Morapitiya north Development of the collapsed section of the main road at Minikandala Palenda near Mr. Kapila’s house, by constructing a side embankment from the culvert area. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
19 837 I Kelenkanda Colony Completion of the roof and development of the partially completed preschool building. Human resource development       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
20 836 J Bampara Development of the first lane of the Kumburuhena Dostravatta Road by laying concrete. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Preparation of land in the government-owned area at Kosgas Junction for the construction of public utility buildings, including a service center, community hall, preschool, and rural bank. Human resource development       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
21 836 K  Walakada Development of difficult roads in the Walakad Grama Niladhari Division by constructing drainage systems (Samanpura Road, Kanda Uda Road, Kanda Uda Alternative Road, Yalamediya Uduwakanda Road, Yalamediya Kelin Kanda Road, Kos Hena Road, Hal Gaha Hena Road, Batahena Alternative Road, and Walakad Kapugedara Road). නිෂ්පාදන ආර්ථිකය        1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
22 836 L Kosgulana Development of Maakeliyawatta Edge Road by laying concrete from near the army camp, extending further ahead. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
23 836 M  Abegoda Development of Meda Para Road by laying concrete from near the residence of Mr. M.D. Indika towards the residence of Mr. K.A. Chamara. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
24 836 N  Diganna Concreting the road leading to Mr. U.K. Munidasa’s residence in Thennapita, and continuing the concreting from the completed section further ahead. Supply networks and access.       1,100,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Construction of the main gate and rear gate of Diganna Primary School, and completion of the remaining section of the security fence. Supply networks and access.          300,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
25 837 Midalana Development of Pollegoda Road by laying concrete from the completed section further ahead. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Provision of sewing machines to an identified women’s group in the division to promote employment generation. Production Economy       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
26 837 Amidalana West Concreting Godaudahena Road from the completed section onwards. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
27 838 Hedigalla Construction of a new playground at Vipulasiri Vidyalaya. Human resource development       1,000,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
Construction of a passenger shelter at Gurulubedda Junction. Supply networks and access.          400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Road Passenger Transport Authority"
28 838 A Batahena Construction of the second floor of the existing community hall building and provision of office facilities for government officials. Social environment.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
29 839 Baduraliya Development of Hospital Mawatha–Gal Amuna Road by laying concrete. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
30 839 Amagura west Provision of two tents measuring 20 ft in length and 12 ft in width, 100 armless chairs, one buffet set (7 pieces), and one 3 kW generator for the Magura Western Ekamuthu Welfare Society. Social environment.          800,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Expansion of the Magura Community Hall and construction of a storage room. Supply networks and access.          600,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Construction of a well and a water tank at Magura Primary School, and provision of safe and proper drinking water to all classrooms. මානව සම්පත්       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
31 839 B Kamburawala Development of Arachi Gedara Road by laying concrete from the completed section onwards. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
32 839 C Diggoda Construction of a retaining wall approximately 4.5 feet high and 65 feet long at the hazardous section of Alabada Primary School, with earth filling, and installation of a 120-foot pavement around the building. Human resource development       1,000,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
Construction of a bund at the uphill source of the existing water supply project at Pillawalakada to collect water, and installation of pipes to channel water into two tanks and distribute it downstream (this funding will be used for the construction of the bund and the installation of pipes). Human resource development          400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment National Water Supply and Drainage Board – Rural Water Projects Division
33 839 Dmagura west Widening and development of the Atambagoda Halkumbura canal from the Magura River boundary for approximately 750 meters, and construction of six culverts for the Horagodawatta Road (near the transformer) across the canal. Food Security          900,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
Development of Magura Sinidugahagoda Road by laying concrete for approximately 25 meters, from near the residence of Mr. W.A. Lionel Wickramarachchi to near the residence of Mr. P.H.C. Ajith. Supply networks and access.          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
34 840 Kalugala Provision of all necessary equipment and acquisition of required books to establish a library and reading room on the upper floor of the Kalugala Service Center. Supply networks and access.          600,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Construction of a protective handrail at the Service Center, provision of drinking water facilities, installation of an electrical system on the upper floor, provision of office facilities for officers on the ground floor of the Service Center, and sanitation and other development works at the Service Center. Supply networks and access.          800,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
35 840 A Penigala Concreting the undeveloped section of Samagi Mawatha Kanda Road, from near the turn-off to Mrs. Krishantha Sri Kumari’s residence, extending further ahead. Supply networks and access.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
36 840 B Addaragoda Renovation of the roof of the Addaragoda Community Hall and allocation of rooms for government officials. Protection          600,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Construction of a side embankment in front of the community hall. Protection          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Construction of a storage room at the community hall. Protection          300,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
37 841 Athale Completion of the partially finished well at Atale Maha Vidyalaya, installation of a water pump, and provision of water to the school. Human Resource Development          400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
Development of Atale Medawatta Road by laying concrete from the completed section onwards. Supply networks and access.       1,000,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
38 842 A Igurudaluwa Provision of water to Hedigalla Janapadaya Maha Vidyalaya and construction of a protective fence around the school. Human resource development          900,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Regional Engineering Office
Repair of the culvert near Mr. Lal’s shop on the Dikheena–Baduraliya main road. Supply networks and access.          500,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
39 841 B  Batagodawila Renovation and development of the Dikheena Public Service Building (repairing the damaged roof, installing wire mesh fencing, and providing drinking water). Protection       1,000,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Development of the playground and construction of a safety fence at Dikheena Samanala Preschool. Protection          400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
40 841 C Bollunna Rehabilitation of the Bollunna water supply project (construction of a new water tank and removal of the existing pipelines followed by installation of a new pipeline system). Social environment.       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment Water Supply and Drainage Board – Rural Water Division
41 842 Boralugoda Expansion and development of the partially completed ‘Ekamuthu Api’ Community Hall at Boraluagoda by addressing its deficiencies (installation of mesh fencing, floor finishing, and provision of office facilities for government officials). Protection       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
42 842 A Thiniyawala Completion of the remaining renovation works of the 12 Mawatha Community Hall building (as a Dhamma school is primarily conducted in this building, it needs to be repaired urgently). "Social Environment (Community Recreation and Cultural Facilities)       1,400,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
43 842 B Kalukandawa Development of Kalukandawa Road by laying concrete from the location of the temporary polling station onwards. Supply networks and access.          700,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara
Development of the Kirikanda–Hinguruwelkatiya Road by laying concrete from near the residence of Mr. W.C.D. Shiranta, extending further ahead. Supply networks and access.          700,000.00 Ministry of Rural Development, Social Protection and Community Empowerment
Divisional Secretariat Palindanuwara

Progress of the Approved Total Projects in the Palindanuwara Divisional Secretariat Division - 2024

GN Division Project Name Program Allocation Progress
835  A Ilukpotha Development of the Ilukpatha-Pinkumbura-Godella Road Decentralized Budgeting Program 1000000.00 Work Completed
835 B  Lathpadura East Developing the Residential Building at the Meditation Center Decentralized Budgeting Program 500000.00 Work Completed
835 B  Lathpadura East Constructing the Playground at Pannaseena Primary School. Kadukara Dashakaya 1000000.00 Work Completed
835 C Maragahadeniya Construction of Playground at Maliyadewa Primary School. Kadukara Dashakaya 700000.00 Work Completed
836  A Morapitiya Concrete paving of the road from Kotthena Rankoth Mawatha, Upper Street, to the house of Jayasoma Budagoda (Mangala) Mahaththaya. Decentralized Budgeting Program 500000.00 Work Completed
836  A Morapitiya Construction of the playground at Minikandala Primary School. Kadukara Dashakaya 700000.00 Work Completed
836 C Kapugedara Development of Kapugedara public road. Decentralized Budgeting Program 500000.00 Work Completed
836 C Kapugedara Development of Kapugedara public pathway. Decentralized Budgeting Program 500000.00 Work Completed
836 F Galahitiya Development of Galahitiya Huniang Wakkada road. Decentralized Budgeting Program 1000000.00 Work Completed
836 F Galahitiya Development of Galahitiya Vi Mola Kanda road. Decentralized Budgeting Program 500000.00 Work Completed
836 I Kelinkanda Kolani Kelinkanda Village Primary School playground construction. Kadukara Dashakaya 700000.00 Work Completed
836 J Bampara Establishment of a primary treatment unit at Kelinkanda (Health Science Complex). Kadukara Dashakaya 2000000.00 Work Completed
836 K  Walakada Walakkada Primary School playground construction. Kadukara Dashakaya 700000.00 Work Completed
836 K  Walakada Providing a tea plucking machine to the Walakkada Small Tea Growers Development Society. Kadukara Dashakaya 200000.00 Work Completed
836 L  Kosgulana Improvement and development of coconut production. Saugabhaya Production Village Project 1846100.00 Work Completed
836 M  Sbegoda Development of Ambegoda Galagedarawatta. Rural Road Proposed Projects 500000.00 Work Completed
836 N  Diganna Development activities at Walakada Sri Sambuddhathva Jayanti Vihara. Decentralized Budgeting Program 1000000.00 Work Completed
836 N  Diganna Playground construction at Diganna Primary School. Kadukara Dashakaya 1000000.00 Work Completed
837 Midalana Playground construction at Midalana Village Primary School. Kadukara Dashakaya 1000000.00 Work Completed
837 A Midalana West Playground construction at Midalana Primary School. Kadukara Dashakaya 700000.00 Work Completed
838 A Batahena Providing plastic chairs to Bathahena Sarana Seva Welfare Society. Decentralized Budgeting Program 100000.00 Work Completed
838 A Batahena Playground construction at Tawan Primary School. Kadukara Dashakaya 700000.00 Work Completed
839 Baduraliya Providing solar-powered street lights and poles to the Pradeshiya Sabha. Decentralized Budgeting Program 300000.00 Work Completed
839 Baduraliya Development of Baduraliya Hospital Road. Decentralized Budgeting Program 1000000.00 Work Completed
839 Baduraliya Development of Baduraliya Wathuraana Public Sports Ground. Kadukara Dashakaya 6400000.00 Work Completed
839 Baduraliya Playground construction at Wathuraana Saraswathi Primary School. Kadukara Dashakaya 1000000.00 Work Completed
839 Baduraliya Concrete development of the road from Viraj's house to the bus stop in front of Baduraliya. Rural Road Proposed Projects 2000000.00 Work Completed
839 A Magura West Development of Magura Dikhena Road. Decentralized Budgeting Program 500000.00 Work Completed
839 A Magura West Playground construction at Magura Primary School. Kadukara Dashakaya 700000.00 Work Completed
839 B Kamburawala Development of Horahena Water Project. Kadukara Dashakaya 4000000.00 Work Completed
839 C Diggoda Development of Kanattagoda Kovilagoda Road. Decentralized Budgeting Program 500000.00 Work Completed
839 C Diggoda Playground construction at Alabada Primary School. Kadukara Dashakaya 700000.00 Work Completed
839 C Diggoda Concrete development of the road from Nil’s house in Pilwalakada Road. Rural Road Proposed Projects 3000000.00 Work Completed
839 C Diggoda Development of Upper Alabada Digbada Road. Rural Road Proposed Projects 500000.00 Work Completed
839 D Magura East Development of the road near the house of Magura Eastern Mangi Silva. Decentralized Budgeting Program 500000.00 Work Completed
840 A Penigala Playground construction at Gurulubadda Primary School. Kadukara Dashakaya 1000000.00 Work Completed
840 A Penigala Development of Gurulubadda Road. Rural Road Proposed Projects 500000.00 Work Completed
841 C Bollunna Playground construction at Bollunna Primary School. Kadukara Dashakaya 700000.00 Work Completed
Common Providing chairs to registered death relief/welfare societies. Decentralized Budgeting Program 500000.00 Work Completed
Common Providing music equipment to registered temples. Decentralized Budgeting Program 100000.00 Work Completed
Common Providing cricket and volleyball equipment to registered sports clubs. Decentralized Budgeting Program 200000.00 Work Completed
Common Providing aid to registered retired war heroes' associations. Decentralized Budgeting Program 100000.00 Work Completed
Common Providing plastic chairs to welfare societies. Decentralized Budgeting Program 400000.00 Work Completed
Common Providing musical instruments to one school. Decentralized Budgeting Program 500000.00 Work Completed
Common Providing public address system to one school. Decentralized Budgeting Program 180000.00 Work Completed
Common Providing plastic chairs to welfare societies. Decentralized Budgeting Program 800000.00 Work Completed
Common Providing buffet sets to welfare societies. Decentralized Budgeting Program 100000.00 Work Completed
Common Providing tailoring equipment to registered voluntary societies. Decentralized Budgeting Program 200000.00 Work Completed
Common Providing grass-cutting machines to agricultural organizations. Decentralized Budgeting Program 100000.00 Work Completed
Common Providing mud boards to voluntary societies. Decentralized Budgeting Program 200000.00 Work Completed
Common Providing steel cabinets to registered Dharma schools. Decentralized Budgeting Program 400000.00 Work Completed
Common Providing sports equipment to registered youth and sports organizations. Decentralized Budgeting Program 200000.00 Work Completed
Common Providing medicinal or grass-cutting machines to 10 farmer organizations. Decentralized Budgeting Program 300000.00 Work Completed
Common Providing necessary equipment to cultural centers. Decentralized Budgeting Program 500000.00 Work Completed
Common Providing equipment to welfare societies under the Palindanuwara Pradeshiya Sabha. Decentralized Budgeting Program 400000.00 Work Completed
Common Providing equipment to Hindu temples under Palindanuwara Pradeshiya Sabha. Decentralized Budgeting Program 400000.00 Work Completed
Common Implementing 10 agriculture-related projects in the Palindanuwara Pradeshiya Sabha area. Kadukara Dashakaya 10000000.00 Work Completed
Common Providing boots and jackets to 31 members of small tea plantation societies under the Palindanuwara Pradeshiya Sabha. Kadukara Dashakaya 8000000.00 Work Completed
835  A Ilukpotha Development of Athahawulhena-Omatha public connecting road. Western Provincial Councial 5000000.00 Work Completed
836 I Kelenkanda Kolani Rehabilitation of the remaining portion of the high Nelu Ketiya road in Kelinkanda Village. Western Provincial Councial 500000.00 Work Completed
838 Hedigalla Rehabilitation of the Hadigalla Gurulubadda new road. Western Provincial Councial 2600000.00 Work Completed
839 Baduraliya Setting up a volleyball court at Baduraliya Public Sports Ground. Western Provincial Councial 300000.00 Work Completed
839 Baduraliya Development of Baduraliya Hospital Road. Western Provincial Councial 5000000.00 Work Completed
839 Baduraliya Development of the road from Yasasi Meheni Aramaya on Wathuraana Road. Western Provincial Councial 700000.00 Work Completed
839 A Magura West Development of the road to Lakshman’s house near Parakattiwila, Magura. Western Provincial Councial 2500000.00 Work Completed
834 A  Bellana East Playground construction at Halodola Jinavamsa Primary School. Kadukara Dashakaya 1000000.00 Work Completed
834 B Kapugama Development of the children’s garden at Bellana Pradeshiya Sabha preschool. Kadukara Dashakaya 1000000.00 Work Completed
834 D Yakupitiya Playground construction at Yakupitiya Chandavimala Primary School. Kadukara Dashakaya 700000.00 Work Completed
835 Lathpadura Providing plastic chairs to Kandawatta United Welfare Society. Decentralized Budgeting Program 100000.00 Work Completed
835 Lathpadura Playground construction at Siddhartha Primary School. Kadukara Dashakaya 1000000.00 Work Completed
838 Hedigalla Development of difficult spots along the Kohiladenihenna Mahakoswatta road using concrete. Western Provincial Councial 1500000.00 Work Completed
835  A Ilukpotha Development of the road from Somarathna's house at Agalawatta Omatha, 1.5 km using machinery. Decentralized Budgeting Program 1000000.00 Work Completed
836 B Kelinkanda Providing 12 feet Amano sheets to Kelinkanda Welfare Society. Decentralized Budgeting Program 100000.00 Work Completed
835  A Ilukpotha Playground construction at Ilukpotha Primary School. Kadukara Dashakaya 1000000.00 Work Completed
836 E Peleda West Playground construction at Palaenda Tamil Primary School. Kadukara Dashakaya 1000000.00 Work Completed
839 Baduraliya Providing a solar system to the Palindanuwara Pradeshiya Sabha. Kadukara Dashakaya 1000000.00 In operation
836 E Peleda West Renovating the Palaenda Public Sports Ground. Kadukara Dashakaya 15000000.00 In operation
836 F Galahitiya Development of the sports ground at Askelia Tamil Vidyalaya. Kadukara Dashakaya 1000000.00 In operation
835 B  Lathpadura East Development of the remaining section of the Dalkit plantation village road. Kadukara Dashakaya 5900000.00 In operation
836 B Kelinkanda Providing a friendly classroom to Kelinkanda Maha Vidyalaya. Kadukara Dashakaya 1000000.00 In operation
co Providing essential items worth Rs. 50,000 to 100 underprivileged families without sanitation facilities for the construction of toilets. Kadukara Dashakaya 5000000.00 In operation
841 A Igurudaluwa Rehabilitation of the Puakadola Malwatta Road in Hadigalla. Kadukara Dashakaya 1000000.00 Work Completed
836 F Galahitiya Development of the Ranviru Road in Baduraliya, a 200-meter stretch in Palindanuwara Grama Niladhari area. Western Provincial Councial 2800000.00 Work Completed
841 B  Batagodawila Development of the Bathgettikanda-Dikhena alternative road in Palindanuwara Pradeshiya Sabha. Western Provincial Councial 1500000.00 In operation
836 E Peleda West Development of a new road in Palaenda Bad Western Sports Ground. Western Provincial Councial 1000000.00 In operation
840 B Addaragoda Providing necessary equipment to registered funeral, welfare, elderly, women, sports, and voluntary societies in Palindanuwara. Western Provincial Councial 500000.00 Work Completed
Common Providing items to registered welfare societies, elderly societies, rural development societies, and Dharma schools under Palindanuwara. Western Provincial Councial 1380000.00 Work Completed
839 Baduraliya Promoting and developing cinnamon production. Western Provincial Councial 500000.00 Work Completed
842 A Thiniyawala Developing and promoting cinnamon production - Phase 2. Western Provincial Councial 400000.00 Work Completed
838 Hedigalla Providing facilities to tourists visiting Makeli Diyadella in Kosgulana Grama Niladhari area. Western Provincial Councial 200000.00 In operation
840 A Penigala Establishing an environmental tourist zone near Kabaragoya Falls. Western Provincial Councial 500000.00 In operation
836 J Bampara Installing a nameplate project based on an overhead structure. Western Provincial Councial 1500000.00 Work Completed
835 B  Lathpadura East Development of the Athwelthota Grama Niladhari area near the Athwelthota Falls. Decentralized Budgeting Program 100000.00 Work Completed
840 B Addaragoda Developing the Bokkuwa area along the Harambakanda road hit by disasters. Rural Road Proposed Projects 500000.00 Work Completed
836 G  Morapitiya Development of the road near Chandare's house (New Road) Rural Road Proposed Projects 500000.00 Work Completed
836 F Galahitiya Development of the Galahitiya Kanatha road Decentralized Budgeting Program 1500000.00 Work Completed
836 E Peleda West Concrete paving of the Ransirigama road Decentralized Budgeting Program 100000.00 Work Completed
Comman Provision of necessary equipment and empowerment for registered organizations in the Palindanuwara Divisional Secretariat such as funeral, welfare, elderly, women’s, sports, and voluntary organizations Decentralized Budgeting Program 2000000.00 Work Completed
Common Provision of goods to registered welfare societies, elderly societies, rural development societies, and Buddhist schools in the Palindanuwara Divisional Secretariat Decentralized Budgeting Program 1000000.00 Work Completed
836 L  Kosgulana Promotion and development of coconut production Saugabhaya Production Village Project 2103750.00 Work Completed
836 K  Walakada Promotion and development of coconut production Saugabhaya Production Village Project 1813960.00 Work Completed
836 K  Walakada Promotion and development of coconut production - Phase 2 Saugabhaya Production Village Project 324000.00 Work Completed
836 B Kelinkanda Promotion and development of coconut production Saugabhaya Production Village Project 1868130.00 Work Completed
836 L  Kosgulana Providing facilities for tourists visiting the Makeli Diyagala Falls in the Kosgulana Grama Niladhari Division Tourism Development Projects 1500000.00 In operation
836 M Abegoda Establishing an environmental tourism zone near the Kabargoyella Falls Tourism Development Projects 2000000.00 In operation
836 M Abegoda Project to install a nameboard based on the Ahass Bokkuwa area Tourism Development Projects 30000.00 In operation
836 D Athwelthota Development project for Athwelthota Falls in the Grama Niladhari Division of Athwelthota Tourism Development Projects 180000.00 In operation
836 N  Diganna Development of a disaster-prone Bokkuwa area on the Diganne Harambakanda road Disaster Mitigation Projects 5000000.00 In operation

Sapiri Gamak Peoples's partticipatory Rural Development Programme - 2020

Juni

Gamperaliya Development Programme 2019 - Monthly Progress    

News & Events

28
ஆக2017
அஸ்வெசும விண்ணப்பத்தை பரிசோதித்தல்

அஸ்வெசும விண்ணப்பத்தை பரிசோதித்தல்

https://iwms.wbb.gov.lk/household/search     අවුරුදු 60වැඩි ජනගහනය සදහා...

குடியுரிமை சாசனம்

Scroll To Top